United Hydrovac
Safety & Compliance

The method is the safety program

A hydrovac truck can't slice a gas line the way an excavator bucket can. Pressurized water and vacuum remove soil without mechanical force against the utility. That's why utility owners specify hydro excavation for work near their assets. Everything below is how we keep that promise on every dig.

Certifications & Affiliations

Credentials your compliance team will ask about

Gold Shovel Standard
PG&E Gold Shovel
Certified under the Gold Shovel Standard for excavation damage prevention.
Operating Engineers Local 3
Operating Engineers Local 3
Signatory contractor. Trained union operators on every truck.
ISN Certified
ISNetworld Member
Safety programs, stats, and insurance kept current on ISN for owner review.
01

Non-destructive digging as damage prevention

The core of our safety case is physics, not paperwork: water breaks soil, vacuum removes it, and nothing mechanical touches the utility. Near gas transmission, fiber trunks, or anything you can't afford to hit, hydro excavation is the damage-prevention method, which is why utility owners increasingly require it within the tolerance zone.

No mechanical contactApproved within tolerance zonesPrecise around live utilities
02

Operator training & certification

Every operator is trained on the equipment, the excavation standards, and the utility-specific requirements of the clients we serve. Certifications are kept current and documentation is available for vendor qualification.

Equipment certificationExcavation safety trainingRecords available on request
03

811 / call-before-you-dig, every time

No dig starts without a valid USA North 811 ticket, marks verified on the ground, and the tolerance zone respected. If marks and reality disagree, we daylight first and dig second: that's the whole point of the service.

Valid ticket before mobilizationMarks verified on siteDaylight before dig
04

PPE & site protocol

Full PPE is standard: hard hat, hi-vis, eye and hearing protection, gloves, and boots, plus site-specific requirements when working inside plants or public rights-of-way. Crews arrive briefed on the site's hazards, not learning them on arrival.

Full PPE standardSite-specific briefingsTraffic control aware
Call Before You Dig

The 811 process, on every job, no exceptions

Step 1
Ticket filed
USA North 811 ticket in place before the truck rolls.
Step 2
Marks verified
Locate marks walked and confirmed against the dig plan.
Step 3
Daylight first
Utilities inside the tolerance zone are exposed by water, not steel.
Step 4
Documented
Photos and dig records kept for your compliance file.

Need our safety documentation?

Certs, insurance, and program details for vendor qualification: ask and we'll send the packet.

Call now